‹ All lines
ERL

KLIA Transit — Simulator

06:00:00
OFF-PEAK
Loading map…
Service day — drag to any time06:00
06091215182124

Ridership & frequency

Real KLIA Transit 21,715/weekday. Frequency sets how many trains run in peak vs. off-peak.

System status

0Trains running
Average headway
3Target fleet size
0Passengers waiting now
Avg wait (Little's law)
0Total boarded
0Left behind (full train)

8 sets in the pool. Demand is a modelled origin–destination profile scaled to 21,715 weekday boardings, with directional AM/PM peaks.

Data & thanks

Stations, colours & service facts from Wikipedia and the operators' official pages; station coordinates from the official GTFS open data (data.gov.my) where available. The route is drawn through the station coordinates, and ridership uses a modelled demand profile scaled to published figures. Basemap by CARTO.

About the KLIA Transit simulator

This is a free, interactive simulator of the KLIA Transit (ERL), operated by Express Rail Link Sdn Bhd in Greater Kuala Lumpur / the Klang Valley, Malaysia. The line runs 57 km across 6 stations from KL Sentral to KLIA T2. All-stops airport commuter service on the Express Rail Link, running from KL Sentral to KLIA Terminals 1 and 2 with intermediate stops at Bandar Tasik Selatan, Putrajaya & Cyberjaya and Salak Tinggi.

What the simulator shows

Trains move along the line on a live map, following the time of day with an adjustable speed and a draggable timeline. Service ramps up from the depots at 06:00 towards a 20-minute peak headway (30 minutes off-peak), using Siemens Desiro ET 425 M / CRRC Changchun EMU trains. Stations show live platform crowding, and passenger demand follows realistic morning and evening peaks scaled to about 21,715 weekday boardings.

Stations on the line

KL Sentral, Bandar Tasik Selatan, Putrajaya & Cyberjaya, Salak Tinggi, KLIA T1, KLIA T2.

Shares its 160 km/h track with the KLIA Ekspres, the premium non-stop service that runs KL Sentral to KLIA T1 in about 28 minutes (T2 about 33 minutes) skipping all intermediate stations. KLIA Transit opened 20 June 2002; the 2.14 km extension to KLIA T2 (then klia2) opened 1 May 2014, bringing the route to about 59 km. Ridership figure is the Q1 2026 daily average (7.19 million passengers in 2025). Fleet mixes Siemens Desiro ET 425 M and newer CRRC Changchun articulated 4-car EMUs.